
Galaxy (Phase 1)
Access Control Systems
Installation and commissioning of integrated access control systems.
Project experience
Experience across integrated resorts, premium hospitality, casinos, public infrastructure, commercial environments and long-term technical maintenance contracts.
Since 2005
Continuous experience in technical projects and specialised maintenance.
Hospitality & Enterprise
Resorts, casinos, retail, public institutions and corporate environments.
ELV • MEP • AV • IT
Multidisciplinary integration for critical and high-end environments.
Featured
Recent references with strong technical scope, multi-system integration and demanding operational environments.

Galaxy (Phase 1)
Installation and commissioning of integrated access control systems.

Sands Cotai Central
Installation and commissioning of integrated access control systems.

Sands Cotai Central Theatre
Installation of data network systems supporting theater operations, technical infrastructure and operational reliability.

MGM Cotai
Design, installation and commissioning of dry fire protection systems integrated with the building fire alarm and safety infrastructure.

Wynn Palace – Chairman’s Club Reconfiguration
Supply, installation and integration of ELV systems including data networks, background music, access control and AV systems, supporting the reconfiguration of the Chairman’s Club operational environment.

The Venetian
Migration and integration of centralized control and monitoring systems ensuring operational continuity and system optimization.

Novos Aterros Urbanos (Zone A)
Supply, installation and coordination of ELV infrastructure and integrated systems supporting large-scale urban development works.

Sands Cotai Central – Le Jardin
Coordination and implementation, including supply and installation, of MEP and ELV systems supporting hospitality and landscape operational requirements.

Wynn Palace
Design, coordination and implementation of AV systems supporting site-wide operations.

Grand Lisboa Palace
Design, installation and commissioning of surveillance systems during the construction period.
Track record
A consolidated list of recent and ongoing references, designed to scale beyond static project cards.
Location
Project
Access Control Systems
Work Description
Installation and commissioning of integrated access control systems.
Systems
Location
Project
Access Control Systems
Work Description
Installation and commissioning of integrated access control systems.
Systems
Location
Project
ELV Works
Work Description
Installation of data network systems supporting theater operations, technical infrastructure and operational reliability.
Systems
Location
Project
Dry Fire System
Work Description
Design, installation and commissioning of dry fire protection systems integrated with the building fire alarm and safety infrastructure.
Systems
Location
Project
ELV Systems
Work Description
Supply, installation and integration of ELV systems including data networks, background music, access control and AV systems, supporting the reconfiguration of the Chairman’s Club operational environment.
Systems
Location
Project
CCMS Migration
Work Description
Migration and integration of centralized control and monitoring systems ensuring operational continuity and system optimization.
Systems
Location
Project
ELV Systems
Work Description
Supply, installation and coordination of ELV infrastructure and integrated systems supporting large-scale urban development works.
Systems
Location
Project
MEP & ELV Works
Work Description
Coordination and implementation, including supply and installation, of MEP and ELV systems supporting hospitality and landscape operational requirements.
Systems
Location
Project
AV Systems
Work Description
Design, coordination and implementation of AV systems supporting site-wide operations.
Systems
Location
Project
CCTV Works
Work Description
Design, installation and commissioning of surveillance systems during the construction period.
Systems